Plans for UK’s first £165m ‘plastic park’ submitted

Peel NRE has submitted a planning application for the ‘Plastic Park’ to be developed at Protos, the company’s strategic energy and resource hub near Ellesmere Port, Cheshire. It will cluster together processing and treatment technologies with an aim of getting ‘the most value’ from plastic waste.

Two facilities at the Plastic Park have already received planning consent – the UK’s first waste plastic to hydrogen facility using pioneering Powerhouse Energy technology and a PET (polyethylene terephthalate) recycling plant that will take food and beverage packaging, such as plastic bottles, and recycle them for use in making new packaging products.

Peel NRE is now seeking planning approval for a number of further facilities which would provide capacity for up to 367,500 tonnes of mixed recyclables and plastic and create 147 new jobs.

The application follows a public consultation where nearly 300 local people took part. An overwhelming majority of respondents agreed that more plastic recycling facilities are needed in the UK.

Richard Barker, Development Director at Peel NRE, part of Peel L&P, said: “As our pre-application consultation showed, the issue of plastic waste is high up the agenda.

By clustering various treatment technologies together in one place, we can maximise the amount of plastic that can be recycled and create a circular economy in the North West.

“By clustering various treatment technologies together in one place, we can maximise the amount of plastic that can be recycled and create a circular economy in the North West.

“Over time, the flow of materials between the different facilities means vehicle movements will reduce and we will use any plastic that can’t be recycled to create hydrogen which can be used as a clean fuel for HGV’s, buses and cars.”

“This will not only create 147 jobs and address the urgent need to tackle plastic waste, it’ll also deliver significant carbon savings, helping the North West reach its ambition to be the first net zero region in the UK.”

It comes as the UK prepares to host the global climate summit, COP26, in Glasgow this November. Peel NRE’s innovative Plastic Park would contribute significantly to the North West of England becoming carbon neutral by 2040. As well as reducing the need for virgin plastic, the facilities would save over 190,000 tonnes of CO2 every year when compared to landfill.

The latest planning application features:

  • A Materials Recycling Facility (MRF): which will separate out dry mixed recyclable materials (such as glass, paper, cans and card) into different waste streams and send them for recycling.
  • Plastics Recycling Facility One (PRF1): plastic from the MRF and mixed plastics arriving pre-sorted to the site will be separated into different plastic types. The separated plastic will either go to PRF2 or the PET recycling plant already consented at Protos.
  • Plastics Recycling Facility Two (PRF2): pre-sorted plastic from PRF1 will be washed and processed into flaked plastic which can be used to make new plastic products, such as food packaging or drinks bottles.
  • Polymer Laminate Recycling Facility: plastic (such as crisp packets and baby food pouches) will be heated, the plastic will break down into an oil for reuse in manufacturing new products with the aluminum recovered for recycling.
  • Hydrogen refueling station: taking hydrogen from the consented plastic to hydrogen facility to supply up to 1000kg of hydrogen per day to vehicles, sufficient to fuel approximately 20 HGVs from outside Protos and a similar number of internal HGV movements that will be servicing operations within Protos.

The application will now be considered by Cheshire West and Chester Council with a decision expected in early 2022.

Privacy Overview
Circular Online

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is temporarily stored in your browser and helps our team to understand which sections of the website you find most interesting and useful.

More information about our Cookie Policy

Strictly Necessary Cookies

Strictly necessary cookies allow core website functionality and the website cannot be used properly without them. These cookies include session cookies and persistent cookies.

Session cookies keep track of your current visit and how you navigate the site. They only last for the duration of your visit and are deleted from your device when you close your browser.

Persistent cookies last after you’ve closed your Internet browser and enable our website to recognise you as a repeat visitor and remember your actions and preferences when you return.

Functional cookies

Third party cookies include performance cookies and targeting cookies.

Performance cookies collect information about how you use a website, e.g. which pages you go to most often, and if you get error messages from web pages. These cookies don’t collect information that identifies you personally as a visitor, although they might collect the IP address of the device you use to access the site.

Targeting cookies collect information about your browsing habits. They are usually placed by advertising networks such as Google. The cookies remember that you have visited a website and this information is shared with other organisations such as media publishers.

Keeping these cookies enabled helps us to improve our website and display content that is more relevant to you and your interests across the Google content network.

Send this to a friend